Facilities Standards Manual
- Cover and Introduction
- A/E Sample Contract Long Version
- 3 Page Architect/Engineer Contract
- 3 Page Non-Architect/Engineer Contract
- Contractor Contract
- Construction Manager Agreement
- Performance and Payment Bond Sample
- Construction Change Process
- IT Wiring Closet Standards
- Carpet Specifications
- Tile Specifications
- Elevator Specifications
- Roof System Standards
- Fire Alarm Specifications
- Energy Management Specifications
- Planning Check List
- Design, Construction Index
- Office and Furniture Standards
- Equipment Room Color Standards
- Card Access
- Dispenser Specifications
- Payment Procedures for CM Contracts
- Weapons in County Facilities
- Project Closeout Requirements
- Break Room Appliance Guidelines
- Tarrant County Seal
- Courtroom Gate Closure
- Safe Area Sign
- Refrigerant Management Clean Air Act 1990 Compliance
- Flue Pipe for Condensing Boilers
- Quality Control Examples
Accessibility Notice: Due to the complexity of the preceding documents, these documents are scanned images. If you require assistance in accessing the information, please contact Susan Strange at 817-884-1149.